What was found
AT C-CHECK, FLOOR SUPPORT FLANGE AT LBL 20 IS CRACKED JUST FWD OF BS 400. INSTALLED NEW FLOOR SUPPORT PER SRM 51-10-1 20.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT C-CHECK, FLOOR SUPPORT FLANGE AT LBL 20 IS CRACKED JUST FWD OF BS 400. INSTALLED NEW FLOOR SUPPORT PER SRM 51-10-1 20.