What was found
AT D-CHECK, X-RAY RESULTS SHOW CRACK AT UPPER I/B AREA OF RT ELEVATOR. CUT OUT DAMAGED AREA 5, NDT SHOWS NO FURTHER CRACK. INSTALLED REPAIR PER SRM 55-20-3, 9 X 4. REBALANCED RT ELEVATOR PER SRM 51-80-7.