What was found
AT D-CHECK, S-DUCT HAS CORROSION BULGE AND CRACKED SKIN IN INTERIOR JUST AFT OF PRODUCTION BREAK. CUT OUT AREA OF S-DUCT, 16 BY 6.75 AND PLATE FROM PRODUCTION JOINT 8.5. REPAIRED DAMAGED AREA AT 6 O' CLOCK PER SRM 54-10-3. DOUBLERS 23 BY 10.5, FILLER 16 BY 6.75. SPLICE PLATE 8.5 BY 3 AND SPLICE 4 BY 3.