What was found
AT D-CHECK, FLOORBEAM HAS CORROSION AT STA 640 RBL 24-63. CUT OUT DAMAGED AREA, INSTALLED CABIN FLOORBEAM REPAIR. RBL 24 TO 36 PER SRM 53-10-8, REMOVE CORROSION ON UPPER SURFACE FROM RBL 36 TO 63, MATERIAL LOSS WITHIN LIMITS PER SRM 53-10-1.