What was found
AT D-CHECK, FUSELAGE FRAME CRACKED AT I/B RADIUS STA 930 NEAR STR 14 LT. STOP DRILLED CRACK, ACCOMPLISHED HFEC, INSTALLED FRAME REPAIR PER SRM 53-10-4, 11 BY 4.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT D-CHECK, FUSELAGE FRAME CRACKED AT I/B RADIUS STA 930 NEAR STR 14 LT. STOP DRILLED CRACK, ACCOMPLISHED HFEC, INSTALLED FRAME REPAIR PER SRM 53-10-4, 11 BY 4.