What was found
AT C-CHECK, FWD CARGO FRAME AT STA 600 IS CRACKED AT UPPER FLANGE AT RBL 2 AND RBL 9. STOP DRILLED CRACKS, HFEC CRACKS, CUT OUT DAMAGED AREA, INSTALLED REPAIR PER SRM 53-10-4, REPAIR 15 BY 3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT C-CHECK, FWD CARGO FRAME AT STA 600 IS CRACKED AT UPPER FLANGE AT RBL 2 AND RBL 9. STOP DRILLED CRACKS, HFEC CRACKS, CUT OUT DAMAGED AREA, INSTALLED REPAIR PER SRM 53-10-4, REPAIR 15 BY 3.