What was found
AFTER TAKEOFF WITH GEAR AND FLAPS UP, THE A- SYSTEM QUANTITY DECREASED TO ZERO. CRANKED GEAR DOWN, EXTENDED FLAPS AND LED WITH ALTERNATE SYSTEM. A-SYSTEM SHUT OFF 7 MINUTES. ABNORMAL PROCEDURES COMPLIED WITH. FOUND NR 1 LEADING EDGE FLAP ACTUATOR LEAKING. REMOVED AND REPLACED PER MM 27-81-22.