What was found
AT C-CHECK, NR 6 FLAP VANE HAS DELAMINATION. REMOVED AND SENT FOR REPAIR AND REINSTALLED PER MM 27-60-0.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT C-CHECK, NR 6 FLAP VANE HAS DELAMINATION. REMOVED AND SENT FOR REPAIR AND REINSTALLED PER MM 27-60-0.