What was found
AT C-CHECK, AFT BAGGAGE COMPT RT SIDE TUNNEL AT STA 1300 FLOORBEAM CORRODED. CUT OUT BEAM, FABRICATED PER EO MMC382N0386 AND INSTALLED AT STA 1300, RBL 51. ANGLE 1.25 X 1.25 X 2.5 X 9.75.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT C-CHECK, AFT BAGGAGE COMPT RT SIDE TUNNEL AT STA 1300 FLOORBEAM CORRODED. CUT OUT BEAM, FABRICATED PER EO MMC382N0386 AND INSTALLED AT STA 1300, RBL 51. ANGLE 1.25 X 1.25 X 2.5 X 9.75.