What was found
AT D-CHECK, FUSE FLOORBEAM CORRODED AT STA 380 BL 49L. CUT OUT FLOORBEAM TO LBL 49. CUT FLOORBEAM CAP OUT FROM LBL 12 TO O/B END. FABRICATED NEW FLOORBEAM TOP CAP WITH SPLICED DOUBLERS PER SRM 53-10-8, 59.5 LONG.