What was found
AT C CHECK, LT INBD HORIZONTAL STABILIZER LEADING EDGE DAMAGED. REMOVED LEADING EDGE FOR APPROX STA 20 LE TO LE STA 147.32 PER SRM 51-30-2. REMOVED RIBS TO AID IN MAINTAINING CONTOUR OF LEADING EDGE IAW SRM 51-30-2. CUT OUT DAMAGED AREA AT LT LEADING I/B HORIZONTAL STAB LEADING EDGE 6 BY 2.5 PER SRM 55-10-3 FIG 2. INSTALLED FLUSH REPAIR AT L/E PER SRM 55-10-3 FIG 2 MATERIAL USED 7075 T6 .063 10 BY 7 DOUBLER, FILLER 6X2 1/2 2024 T3 .050. ALODINED AND PRIMED PER 51-10-2, REINSTALLED FASTENER PER SRM 51-30-2. REINSTALLED LEFT I/B L/E PER SRM 51-30-2, SEALED PER SRM 51-20-4 N/R 4166.