What was found
AT C-CHECK, FLOOR PANEL GALLEY CENTER CHANNEL FRAME IS CRACKED. REMOVED DAMAGED PANEL, FABRICATED NEW AND INSTALLED PER SRM 51-1-21, 25 X 4.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT C-CHECK, FLOOR PANEL GALLEY CENTER CHANNEL FRAME IS CRACKED. REMOVED DAMAGED PANEL, FABRICATED NEW AND INSTALLED PER SRM 51-1-21, 25 X 4.