What was found
ON T/O THE EGT ON BOTH ENGINES WENT OVER 945. THE NR 1 ENG WENT TO 952, THE NR 2 ENG WENT TO 962. THE N1 COMPUTER CALLED FOR 113-5 PERCENT. THE N1 AT 111-0 AT THESE TEMPS. THE TEMP WAS OVER 945 FOR 45 SECONDS. PERFORMED VISUAL INSPECTION ENG''S 1 & 2, NO DEFECTS NOTED PER MM 72-00-00 PG 604. NR 2 ENG BORESCOPE DEFERRED DMI 2030E PER GMM 03-05-01 CAT 1 AND MM 72-00-00 PG 604. ACCOMPLISHED VSV, VSB RIG CHECK, COKE WASH MAX POWER ASSURANCE RUN ACCOMPLISHED TWICE. ENGINE IS OPERATING WITHIN LIMITS.