What was found
BS 720 FRAME HAS DOUBLE DRILLED HOLES BETWEEN STR 16L AND 17L. ACCOMPLISHED FRAME REPAIR AS REQ PER SRM 51-40-3 FIG 1.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BS 720 FRAME HAS DOUBLE DRILLED HOLES BETWEEN STR 16L AND 17L. ACCOMPLISHED FRAME REPAIR AS REQ PER SRM 51-40-3 FIG 1.