What was found
FWD ACCY COMPT L-36 CORRODED STA 35.000. RESOLUTION: PERFORMED MAJOR REPAIR IAW SRM 53-1-0 PG 1, SRM 53-3-3 FIG. 2 SHEET 1 ITEM "A". REMOVED CORROSION IAW SRM 51-1-8 PG 17-18. FOUND OUT OF LIMITS IAW SRM 53-2-0 PG 2P. REMOVED CORRODED LONGERON IAW SRM 53-1-0 PG 1, SRM 51-1-21, SRM 51-1-20D. FABRICATED NEW LONGERON IAW SRM 53-3-3 FIG. 2 SHEET 1 ITEM "A". HEAT TREATED FROM 7075"0" TO 7075T6 IAW SRM 51-1-1 PG 1-13-17 DPS 7.00-1 REV "BL". NDT INSPECTED NEW LONGERON IAW NDT SPM PART 08, SRM 51-1-0A PG 7 TR NR 51-144. NO CRACK FOUND. ENCLOSED SMN FORM 242-4. CLEANED, TREATED AND PRIMED AREA AND LONGERON IAW SRM 51-1-8B. INSTALLED LONGERON IAW SRM 51-1-21, SRM 51-1-20D, SRM 51-3-1.