What was found
DURING A SCHEDULED INSPECTION, MAINTENANCE DISCOVERED A CRACK IN A VERTICAL STABILIZER RIB ABOVE THE ELEVATOR BELLCRANK MOUNTING BRACKET. CRACK WAS .5" LONG AND TERMINATED TO A TOOLING HOLE. CRACK WAS REPAIRED IAW ENGINEERING DATA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING A SCHEDULED INSPECTION, MAINTENANCE DISCOVERED A CRACK IN A VERTICAL STABILIZER RIB ABOVE THE ELEVATOR BELLCRANK MOUNTING BRACKET. CRACK WAS .5" LONG AND TERMINATED TO A TOOLING HOLE. CRACK WAS REPAIRED IAW ENGINEERING DATA.