As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING A SCHEDULED INSPECTION, MAINTENANCE DISCOVERED THE LT ELEVATOR HINGE BRACKET CRACKED. THE CRACK WAS .23 INCHES LONG ON THE OB SIDE. CRACK WAS CONFIRMED THROUGH NDI. MAINTENANCE IS REPALCING THE ELEVATOR HINGE BRACKET. [06-17-07] MAINTENANCE REPLACED THE ELEVATOR ASSEMBLY.