What was found
ON CLIMBOUT THROUGH 29,000 FT, THE CABIN CONTINUED TO CLIMB THROUGH THE PRESET 4,800 CABIN ALITITUDE. DESENCED TO 18,000 WHERE THE CABIN STABLIZED AT 10,000. PACK BLEEDS AND OUTFLOW APPEARED OK. REPLACED RT FLOW CONTROL VALVE, LEAK CKS GOOD. PRESSURIZED A/C TO 7 PSI DIFF, ALL SYS NORMAL.