What was found
DURING HMV, FOUND CORROSION ON FLOOR BEAM STA 344 RBL 50. REPAIRED PER SRM 53-10-8.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HMV, FOUND CORROSION ON FLOOR BEAM STA 344 RBL 50. REPAIRED PER SRM 53-10-8.