SYS-A HYD QTY LEAKED BELOW 2.5 GALS COMPLETED POM PROCEDURES LEAK STOPPED WITH PRESSURE OFF. FOUND A-SYS MODULE LEAKING. BORROWED PART FROM FEDX (S/N 260SA), INSTALLED. PERFORMED OPERATIONAL CK OUT, ALL NML NO LEAKS.