What was found
THE FS 727 BULKHEAD O/B CHORD AT STR 18A WAS FOUND CRACKED AND IS BEING REPLACED PER BACO DWG 65C33722, AS REQUIRED BY DAL EO 3-68646-3AD, WHICH ACCOMPLISHES S/B 737-53-1088. BETWEEN STR S-24 AND S-27, BACB30FP* FASTENERS, SAME SIZE AS REQUIRED BY BP, WERE INSTALLED INSTEAD OF BACR15CE*D AND BACR15BB*D FASTENERS CALLED OUT FOR THIS AREA. THIS ER/A WAS APROVED BY FAA/DER FORM 8110-3 DER DESGINATION NM-2222 DATED 8-22-97.