What was found
DURING HMV, FOUND FS 1640 FLOORBEAM IS CORRODED ACROSS ENTIRE BEAM. REPAIRED BY CLEANING CORROSION, CHECKED DEPTH PER SRM 53-00-51, TREATED AND PAINTED AREA FROM RBL 5 TO O/B END, EXCEPT RBL 39 PER PS 900-2-4-1 NR 2 AND PS 900-3-6-03. FABRICATED T-CAP AND DOUBLERS PER SRM 530-30-51 PG 212, TREATED AND PAINTED T-CAP AND DOUBLERS PER PS 900-2-4-1 NR 2 AND PS 900-3-6-03. INSTALLED REPAIR T-CAP SPLICED AT LBL 51 TO RBL 5 PER SRM 53-50-51 PG 212.