What was found
DURING DIVERSION FOR WEATHER INTO SKG, CAPT PITOT MSG ILLUMINATED ON FINAL. AFTER GO AROUND - AILERON LOCKOUT MSG RUDDER RATIO MSG LT AND RT EEC MSG ILLUM. F/O FLT DIR STOPPED WORKING. DISCOVERED C/B K-15 ON P6-3 PANEL POPPED. RESET, ALL RETURNED TO NORMAL. RUDDER RATIO LIGHT FIM PROCEDURE 27-21-00 PG 107 AND 27-09-00 PG 107 CHECK OUT OF SYS OK. AIL LOCKOUT FIM 27-11-00 CHECK OUT OK. PIMU LT AND RT BITE OK. REMAIN GROUND RUN UP FOR SYS VERIFICATION GOOD.