What was found
DURING HMV, THE NLG PRESSURE DECK INTEGRAL STIFFENER ALONG RBL 40 WAS FOUND CRACKED. THE CRACK WAS TRIMMED OUT AND A FILLER/DOUBLER REPAIR WAS INSTALLED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HMV, THE NLG PRESSURE DECK INTEGRAL STIFFENER ALONG RBL 40 WAS FOUND CRACKED. THE CRACK WAS TRIMMED OUT AND A FILLER/DOUBLER REPAIR WAS INSTALLED.