What was found
AT HMV, INSPECTION FOUND .020 BONDED DOUBLER CORRODED AT STA 325 RIGHT OF CENTERLINE. REMOVED DAMAGE SECTION OF EDGE DOUBLER AND INSTALLED REPAIR PER SRM 53-31-00 PG 863.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AT HMV, INSPECTION FOUND .020 BONDED DOUBLER CORRODED AT STA 325 RIGHT OF CENTERLINE. REMOVED DAMAGE SECTION OF EDGE DOUBLER AND INSTALLED REPAIR PER SRM 53-31-00 PG 863.