What was found
NR 3 HYDRAULIC, RIGHT EDP FAILED FOR TEMP. REPLACED BOTH NR 3 HYDRAULIC PUMPS. REPLACED SYSTEM FILTERS. SERVICED, BLED AND LEAK CHECKED SYSTEM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 3 HYDRAULIC, RIGHT EDP FAILED FOR TEMP. REPLACED BOTH NR 3 HYDRAULIC PUMPS. REPLACED SYSTEM FILTERS. SERVICED, BLED AND LEAK CHECKED SYSTEM.