What was found
DURING THE CURRENT HMV, ADDITIONAL DAMAGE WAS FOUND IN THE AREA OF REPAIR DOUBLER INSTALLED PER ERA 383116-14. THE EXISTING REPAIR WAS REMOVED, AND A BOEING APPROVED REPAIR, WHICH INCREASED THE SIZE OF THE EXISTING REPAIR, INSTALLED. LOCATED AT FS 237 TO 256, L-29L TO L-30.