What was found
DURING HMV AT GDL, CORROSION WAS FOUND IN THE AFT CARGO COMPARTMENT INTERNAL DOOR JAMB DOUBLER AT STA 1209 BETWEEN S-29R AND S-30R. THE DAMAGE WAS REPAIRED PER BOEING INSTRUCTIONS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HMV AT GDL, CORROSION WAS FOUND IN THE AFT CARGO COMPARTMENT INTERNAL DOOR JAMB DOUBLER AT STA 1209 BETWEEN S-29R AND S-30R. THE DAMAGE WAS REPAIRED PER BOEING INSTRUCTIONS.