What was found
THE LT AND RT MLG SUPPORT FITTING BORES WERE CORRODED. THE INBD BORE DIAMETERS EXCEEDED THE LIMITS OF AD 2004-25-14. PER BAC RECOMMENDATION AND AN FAA AMOC APPROVAL LETTER, THE BORES WERE BORED OVERSIZE, AND OVERSIZED BUSHINGS WERE INSTALLED, OTHERWISE PER THE AD REQUIREMENTS.