As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
FOUND ON ARRIVAL LARGE DENT AFT OF L1 DOOR LWR RIGHT. DENT IS IN EXISTING DOUBLER FROM PREV REPAIR. REMOVED DOUBLER AND FORMER CLIP AT FLOOR LINE STA 237. INSTALLED FORMER CLIP AT FLOOR LINE. FABRICATED REPAIR PIECES PER SRM 53-04-05. OK TO INSTALL REPAIR PER SRM 53-04-05 AT STA 237 LONGERON 18L TO 20L QC1502. INSTALLED REPAIR DOUBLER ABOVE FLOOR LINE AT 2TA 237 PER SRM 53-04-05. INSPECT REPAIR.