What was found
FOUND DURING D-2 LETTER CHECK, .25 INCH CRACK AT O/B CORNER OF MLG DOOR FRAME ON EXISTING DOUBLER. REPAIRED PER SRM 53-05 NR 81A.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FOUND DURING D-2 LETTER CHECK, .25 INCH CRACK AT O/B CORNER OF MLG DOOR FRAME ON EXISTING DOUBLER. REPAIRED PER SRM 53-05 NR 81A.