What was found
ON APPROACH, RT HYD SYSTEM DROPPED TO 4 QTS. ACCOMPLISHED POM PROCEDURE. AFTER POM ACCOMPLISHED STABILIZED WITH 3 QUARTS. NORMAL PRESSURE. FOUND PLUG ON RUDDER SHUTOFF VALVE LEAKING. REPLACED O-RING.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ON APPROACH, RT HYD SYSTEM DROPPED TO 4 QTS. ACCOMPLISHED POM PROCEDURE. AFTER POM ACCOMPLISHED STABILIZED WITH 3 QUARTS. NORMAL PRESSURE. FOUND PLUG ON RUDDER SHUTOFF VALVE LEAKING. REPLACED O-RING.