What was found
CORROSION ON FITTING ON AFT SIDE OF APU BAY. REPAIRED BY FABRICATING AND INSTALLING FITTING 18-1/2" FROM 7075-T6511 EXTRUSION IAW DC-9/MD-80 SRM 51-30-5, 51-10-4 PARA 2, 51-10-3D PG 24, 25 AND DELTA PS 900-4-1 NR 1.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION ON FITTING ON AFT SIDE OF APU BAY. REPAIRED BY FABRICATING AND INSTALLING FITTING 18-1/2" FROM 7075-T6511 EXTRUSION IAW DC-9/MD-80 SRM 51-30-5, 51-10-4 PARA 2, 51-10-3D PG 24, 25 AND DELTA PS 900-4-1 NR 1.