What was found
DURING TAKEOFF ROLL LEFT ENGINE PRODUCED 80% N1. SCHEDULED TAKEOFF POWER WAS 90.1% - REMOVED AND REPLACED ENGINE WIRING HARNESS PER P&WC M/M CH 76-20-02 OPERATIONAL CHECKS SATISFACTORY. BOTH AUTO AND MANUAL MODES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING TAKEOFF ROLL LEFT ENGINE PRODUCED 80% N1. SCHEDULED TAKEOFF POWER WAS 90.1% - REMOVED AND REPLACED ENGINE WIRING HARNESS PER P&WC M/M CH 76-20-02 OPERATIONAL CHECKS SATISFACTORY. BOTH AUTO AND MANUAL MODES.