What was found
FLAPS DID NOT EXTEND WHEN COMMANDED. TRIED 10, 20, AND 40 DEGREES AND THE FLAPS NEVER MOVED. THE SLATS EXTENDED NORMALLY. [07-12-07] PERFORMED FUNCTION TEST OF SLAT POSITION DETECTORS AND FLAP POSITION MICRO SWITCHES IAW FALCON 2000 M.M. CHAPT 27-802, ALL RESISTANCE VALUES WERE NORMAL. AFTER RECONNECTING CANNON PLUGS PERFORMED OPERATIONAL CHECKS OF FLAPS AND SLATS IAW FALCON 2000 MM CHAPT 27-305 & 2727-805, OPS CHECK GOOD. REPLACE FLAPS 7* RELAY, (503CF) AND PERFORMED OPS CHECKS IAW FALCON 2000 MM CHAPT 27-505 & 27-805, OPS CHECKS GOOD. NO FAULTS NOTED.