What was found
ON TAKEOFF, WE HAD MACH TRIM, LOWER YD, AND FGC COMPUTER FAIL. PURGED THE NR 1 AND 2 PITOT STATIC SYSTEMS. PERFORMED LEAK TEST OF THE NR 1 AND 2 PITOT STATIC SYSTEMS AND FUNCTION TESTS OF THE NR 1 AND 2 MADC'S SYSTEM TESTED NORMALLY. DONE IAW CESSNA 750 MM 34-11-01 AND 34-11-08.