What was found
LEVEL AT 14,000 FT, CABIN LOST PRESSURIZATION. CABIN WAS CLIMBING AT 3,000 FPM DURING DESCENT. CABIN STAYED AT 2,000 FT UNTIL WE WERE BELOW 8,000 FT OF ALT. CABIN EVENTUALLY CAME DOWN TO FIELD PRESS. R & R PRIMARY OUTFLOW VALVE IAW MM CH 21-32-00. OPERATION PRESSURED LEAK CHECK GOOD.