What was found
DURING FLAP EXTENSION ON APPROACH, THE FLAPS FROZE BETWEEN THE 7 DEGREE DETENT AND THE 15 DEGREE DETENT. RAN FLAPS THUR ALL POSITIONS VARIOUS TIMES - NO DEFECTS NOTED. PLACED LOAD ON FLAPS AND RAN NO DEFECTS. OPEN RT PEDESTAL PANEL. EXAMINED SWITCHES WHILE RUNNING FLAPS - NO DEFECTS. RANG OUT SWITCH - NO DEFECTS NOTED. CLOSED PEDESTAL. COMPLIED WITH FLAP ACTUATOR HYD BYPASS CHECK IAW MM TASK. 25-51-04-790. BOTH ACTUATORS ARE SERVICEABLE AT THIS TIME. C/W ALL SAFETIES. 9-17 RETRACTED FLAPS. OPS CHECKED GOOD.