What was found
ABORTED THE TAKEOFF BETWEEN 50 AND 60KTS DUE TO THE ILLUMINATION OF THE IAS COMPARISON MONITOR ON BOTH PFD'S. PURGED THE NR 1 AND NR 2 STATIC PRESSURE SYS REMOVING EXCESSIVE MOISTURE IN THE STATIC LINES AND R & R GASKET PN M25988-1-010 ON THE PILOTS LT STATIC DRAIN. PERFORMED AIR DATA SYS INSP/ CHECK, LEAK TESTING THE NR 1 AND NR 2 PITOT AND STATIC SYS. SYS TESTED NORMAL. WORK PERFORMED IAW THE MM 34-11-08 AND 34-11-01. TESTED AND INSPECTED THE PILOT AND CO-PILOTS STATIC PRESSURE SYS. ALL WORK PERFORMED IAW NJA'S PART 1.5 GENERAL MM, REV 8.