What was found
ACCOMPLISH BORESCOPE INSPECTION OF COMBUSTION CHAMBER LINER COOLING RING SEGMENT SELF LOCKING NUTS. ACCOMPLISHED PREINDUCTION GROUND PERFORMANCE RUN AND TRANSIENT VIBRATION SURVEY. ACCOMPLISHED A BORESCOPE INSPECTION OF THE COMBUSTION LINER NUTS. ACCOMPLISHED SI 35-2013 INSPECTION SB 30419 LINER. DISCOVERED TWO NUTS MISSING. DISCOVERED IMPART DAMAGE TO THE HPT AND LPT BLADES. ACCOMPLISHED REPAIRS. HPT DISK ASSY 30J3202-01 SN A002XADS: DISASSEMBLED AND VISUALLY INSPECTED. DISCOVERED 25 UNSERVICEABLE BLADES ( IMPACT DAMAGE) ASSEMBLED 45 ORIGINAL BLADES AND 25 NEW BLADES TO THE ORIGINAL SERVICEABLE HPT DISK WITH NEW SEALS.