What was found
AFTER TAKE OFF WITH APU SHUTDOWN, FLOW PACK BOTH, 250 KTS, CLIMBING THROUGH 12000FT CABIN FILLED WITH SMOKE. FOUL SMELLING, BAD TASTING SMOKE. IAW QRH OPENED DUMP VALVE WHICH REMOVED MOST OF SMOKE. INSPECTED EOS SYSTEM FOR OIL CONTAMINATION. FOUND THE OZONE CONVERTER HAS EVIDENCE OF OIL CONTAMINATION. REMOVED & REPLACED THE OZONE CONVERTER. PERFORMED LEAK CHECK, NO DEFECTS NOTED. OPERATED AIRCONDITIONING SYSTEM WITH NO DEFECTS NOTED. ALL WORK DONE IAW AMM 21-11-5, 21-60-00, 21-00-00, 21-11-06 AND 21-70-00.