Service difficulty report · Tube · Emb EMB505

Difficulty date
October 22, 2019
Submitted
November 1, 2019
Operation
Air carrier
Aircraft
N423QS
Make and model
Emb EMB505
Aircraft serial
50500468
Aircraft time
1,139 hours, 918 cycles
Part
Tube
Part number
50519067403
Part serial
F039077526
Condition
Failed
Location
Hyd System
Stage of operation
CR
How discovered
V
Nature of condition
K, J
Precautionary procedure
B

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING FLIGHT HEARD A LOUD SQUEALING NOISE FOLLOWED BY A WHITE HYD SYS FAULT. FOLLOWED THE CHECKLIST. WE PULLED UP THE HYD SCHEMATIC, NOTICED THAT THE HYD PRESSURE WAS SLOWLY GOING TO ZERO. THEN GOT A HYD LO PRESS FOLLOWED BY PUSHER FAIL AND BRK FAIL. COMPLIED WITH ALL CHECKLISTS AND BRIEFED FOR A NO HYD, NO BRAKE LANDING. ELECTED TO DECLARE AN EMERGENCY AND DIVERTED. BEFORE LANDING THE FOLLOWING MESSAGES ALSO WERE DISPLAYED BECAUSE THEY ARE HYD OPERATED. GRD SPLR FAIL, A WHITE SPOILER FAULT. AND PUSHER OFF WHICH WAS SELECTED OFF IAW THE CHECKLIST. REMOVED RT EDP HYDRAULIC RESERVOIR MANIFOLD INLET LINE. INSTALLED NEW TUBE ASSY & PERFORMED HYDRAULIC DECONTAMINATION PROCEDURES. REPLACED LT & RT EDPS. ALL OPS & LEAK CHECKED GOOD. ALL MX COMPLETED IAW AMM 20-10-03, 29-12-02, & 29-10-00. PERFORMED THE INSPECTION EMM 05-50-00-210-822. HYDRAULIC PUMP UNSCHEDULED REMOVAL INSPECTION EMM 05-50-00-210-822 ON LT AND RT ENGINES COMPLIED WITH. PERFORMED THE INSPECTION EMM 05-50-00-210-822, NR1 HYDRAULIC PUMP UNSCHEDULED REMOVAL PERFORMED THE INSPECTION EMM 05-50-00-210-822 NR 1 HYDRAULIC PUMP UNSCHEDULED REMOVAL. DUE TO NR 1 EDP RUNNING WITHOUT HYDRAULIC FLUID FOR MORE THAN 1 HOUR, REMOVED & REPLACED NR 1 EDP WITH REPAIRED IAW AMM 29-12-01. OPS & LEAK CHECKED GOOD. PERFORMED THE INSPECTION EMM 05-50-00-210-822, NR 2 HYDRAULIC PUMP UNSCHEDULED REMOVAL PERFORMED THE INSPECTION EMM 05-50-00-210-822 NR 2 HYDRAULIC PUMP UNSCHEDULED REMOVAL. DUE TO NR 2 EDP RUNNING WITHOUT HYDRAULIC FLUID FOR MORE THAN 1 HOUR, REMOVED & REPLACED THE NR 2 EDP WITH REPAIRED IAW AMM 29-12-01. OPS & LEAK CHECKED GOOD.

More about the Emb EMB-505