Service difficulty report · Control Valve · Cessna 680SOV

Difficulty date
April 29, 2025
Submitted
May 6, 2025
Operation
Air carrier
Aircraft
N372QS
Make and model
Cessna 680SOV
Aircraft serial
6800201
Aircraft time
14,591 hours, 9,639 cycles
Part
Control Valve
Condition
Faulted
Location
Fuel
Stage of operation
DE
How discovered
V
Nature of condition
E, Y
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

RIGHT ENGINE ENGINE COMPRESSOR STALL: AT APPROX. 42000FT IN THE DECENT, A COMPRESSOR STALL WAS FELT FOR ABOUT 5-10 SECONDS, AIRCRAFT VIBRATION WAS FELT AND LOUD BANGING NOISE WAS HEARD. THE R ENGINE SHUTDOWN BLUE ADVISORY MESSAGE WAS ALSO DISPLAYED WITH N1, N2 AND ITT INDICATIONS DECREASING RAPIDLY. THE ENGINE SEEMED TO BE COMPLETELY SHUTDOWN FOR ABOUT 10-20SECS WHEN WE DECIDED TO PUSH THE THRUST LEVER FORWARD WHICH SEEMED TO RELIGHT THE ENGINE. THE EVENT MARKER BUTTON WAS PRESSED AND THE FLIGHT WAS CONTINUED TO A SAFE LANDING WITH NO OTHER ABNORMAL INDICATIONS. CORRECTIVE ACTION: PERFORMED FAULT ISOLATION 3, TABLE 101, FIG 103 IAW PW306C MM REV 51 DATED 4 NOV 2024. FOUND FAULTY FUEL DUMP CONTROL VALVE SEE SQUAWK 3.3 FOR RESOLUTION. RESOLUTION: SIGNED OFF: 05/05/2025 BY: LYLE SHOOK REMOVED FWD UPPER BAGGAGE COMPARTMENT FADEC CONNECTORS ACCESS PANEL. STEP: 1 DESCRIPTION: COMMENTS: REINSTALLED FWD UPPER BAGGAGE COMPARTMENT FADEC CONNECTORS ACCESS PA SIGNED OFF: 05/05/2025 BY: KEVIN BARNETT INSPECTOR: 05/05/2025 BY: LYLE SHOOK DURING TROUBLESHOOTING PROCEEDURES FIG(103) FOUND FAULTY FUEL DUMP VALVE THAT WILL REQUIRE REPLACEMENT. REMOVED FUEL TRANSFRER TUBE FROM DUMP VALVE TO WASTE EJECTOR CANISTER. COMMENTS: REINSTALLED FUEL TRANSFRER TUBE FROM DUMP VALVE TO WASTE EJECTOR CANIST SIGNED OFF: 05/05/2025 BY: KEVIN BARNETT INSPECTOR: 05/05/2025 BY: LYLE SHOOK ITEM: 3 #2 ENGINE STEP: 2 DESCRIPTION: REMOVED FUEL START AND DUMP VALVE PN 26240-7 SN 9959517303 REPLACED FUEL START AND DUMP VALVE WITH INSPECTED PN 26240-7 SN 0937. PERFORMED SATISFACTORY LEAK AND OPERATIONAL CHECKS IAW PW306C MM REV 51 DATED 4 NOV 2024.(TASK 73-10-05). COMMENTS: SIGNED OFF: 05/05/2025 BY: KEVIN BARNETT INSPECTOR: 05/05/2025 BY: LYLE SHOOK COMPLIED WITH NETJETS TASK # T2PL6D00CMNF, RIGHT ENGINE COMPRESSOR STALL. REMOVED AND REPLACED THE RIGHT-HAND ENGINE START DUMP VALVE. REMOVED ONE EACH START/DUMP VALVE P/N 26240-07 S/N 9959517304 AND INSTALLED ONE EACH INSPECTED DUMP VALVE P/N 26240-07 S/N 0937. PERFORMED OPERATIONAL AND LEAK CHECKS. THE OPERATIONAL CHECK WAS GOOD WITH NO LEAKS NOTED. ALL WORK COMPLIED WITH IAW THE PW306C MAINTENANCE MANUAL CHAPTER 73-10-05. ORIGINAL SUBMISSION DATE: 5/2/2025