Service difficulty report · Power Supply · Bombdr BD7001A12

Difficulty date
November 25, 2025
Submitted
December 1, 2025
Operation
Air carrier
Aircraft
N187QS
Make and model
Bombdr BD7001A12
Aircraft serial
70190
Aircraft time
1,018 hours, 363 cycles
Part
Power Supply
Condition
Inoperative
Location
Zone 200
Stage of operation
IN
How discovered
C
Nature of condition
L
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

EMERGENCY LIGHTS AT SEATS 3, 9, & IN ZONE 3 ON THE WALL, FORWARD OF THE DIVAN ARE INOP. POWERED ON AS REQUIRED. VERIFIED DISCREPANCY & NOTED THAT NR 3 ELPS IS MAIN ISSUE. ALLOW ACFT TO CHARGE IT FOR A HOUR, BUT NO JOY. DISCREPANCY STILL STANDS. MCC HAS ALREADY PLACE EMERGENCY LIGHT POWER SUPPLY ON ORDER. WORK PERFORMED IAW AMP BD700-A-J33 53 05 00AAB-320A-A. RECEIVED NEW EMERGENCY LIGHT POWER SUPPLY. GAINED ACCESS TO NR 3 EMERGENCY LIGHT POWER SUPPLY, REMOVED 43 EMERGENCY LIGHT POWER SUPPLY DUE TO INTERNAL FAILURE, & INSTALLED NEW EMERGENCY LIGHT POWER SUPPLY IAW AMP BD700-A-J33 53 11 00AAA. ALLOWED THE BATTERY TO CHARGE & PERFORMED OPS TEST PROCEDURE FOR EMERGENCY LIGHTING POWER SUPPLIES IAW AMP BD700-A-J33-51-00-02AAA-320B-A. THE OPS TEST PROCEDURE FOR THE EMERGENCY LIGHTING POWER SUPPLIES WAS FOUND SATISFACTORY.