What was found
DURING SCHEDULED INSP, FOUND LT ENG COMPARTMENT FUEL HOSE ASSY CHAFED PAST SERVICE LIMITS FROM CONTACT WITH ADJACENT COWLING STRUCTURE. REPLACED HOSE ASSY WITH NEW HOSE ASSY AND SECURED AS REQUIRED. 390 SERIES POWERPLANT INSTALLATIONS HAVE TIGHT CLEARANCES BETWEEN HOSES, WIRING, TUBING, ETC. AND ADJACENT STRUCTURES, TECH SHOULD PAY CLOSE ATTENTION TO THE MM 71-00-00-201 INSP REQUIREMENTS WHENEVER LINES, TUBING, ETC. ARE DISTURBED. CLEARANCE INSP REQUIRED EACH 200 HR AIRFRAME INSP OR ENG INSTALLATION, SHOULD BE CLOSELY ADHERED TO.