What was found
VERTICAL STABILIZER RUDDER HOISTING POINTS 1LT, 2LT, 3LT AND 3RT WITH TRAPPED FLUID. DAMAGED AREAS WERE REPAIRED IAW MESSAGE 70567288/006 DTD SEP 19, 2012 AND TD-K4-S2-39630-2012, ISSUE A, UNDER THE NON ROUTINE ITEM, WO: A1A232, SUBJOB: 3, ITEM: 1.