As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING THE TASK 53-210-003_P1-OP-UP-NDT/00 WORK CARD INSTRUCTIONS ACCOMPLISHMENT RELATED TO AD 2020-17-03, WAS FOUND THE RH CONTINUITY FITTING WITH CRACK. AIRBUS WAS CONTACTED TO REQUEST THE KITS P/N FOR REPLACEMENT. AIRBUS PROVIDED THE INFORMATION WITH DOSSIER 81179738 AND THE REPLACMEENT OF THE PARTS IS COVERED WITH ENGINEERING ORDER E5311-0013 REV 00.