What was found
DURING THE STRUCTURE INSPECTION PER ALLEGIANT WORK ORDER NUMBER 53-210-003 AND AYY EO E5311-0013 WE FOUND AT UPPER FUSELAGE, WINDSHIELD CENTER POST, LOWER ATTACHMENT, CONTINUITY FITTING RH / LH SIDE WITH CRACK. CORRECTIVE ACTION: PERFORMED REPLACEMENT OF THE LH AND RH CONTINUITY FITTINGS PER AIRBUS REPAIR INSTRUCTIONS R531-12919 ISSUE D DATED 09-24-2020 AND DOCUMENTED ON ENGINEERING ORDER ERO NUMBER R5311-0136 REV00 DATED 01-25-2022. THIS IS A PERMANENT REPAIR AND NO ADDITIONAL REQUIREMNENTS ERO R2311-0136 REV00 – N243NV AD 2020-17-03 REPAIR FOR CRACK DAMAGE TO WINDSHIELD FRAME CONTINUITY FITTINGS ACCOMPLISHED. SEE COOPESA WORK ORDER: A1M094, ITEM: 2-12.