What was found
DURING PRESENT CHECK LIGHTNING STRIKE ON FUSELAGE SKIN WAS REPORTED. THE DAMAGE WAS REWORKED AS PER ERJ SRM PART II 51-40-02 PARAG 4 AND EVALUATED THROUGH DAMAGE AS PER ERJ SRM PART II 53-10-01 AD 53 PARAG 4B(6), HOLE FOUND OUT ALLOWABLE DAMAGE LIMITS. DUE TO THIS FACT WE ARE CONTACTING ERJ FOR TECHNICAL SUPPORT EVALUATION AND APPROVAL. PERFORMED PERMANENT THROUGH DAMAGE REPAIR AT FORWARD FUSELAGE, FR11+68MM, STR20LH+95MM AND FR11+70MM, STR21LH+81MM IAW ERJ-190 SRM PART II 53-10-01, AD53, PAR.5, FIG.102 AND FR11+80MM, STR23LH+103MM IAW COOPESA’S EO NUMBER COO-EO-2024-20481-R00, REV.00 DATED JUL-23-24 AND EMBRAER TECHNICAL DISPOSITION ETD2024-190-019812 DATED JUL-21-24. THIS IS A MINOR REPAIR, DOCUMENTED ON COOPESA’S ITEM: A1P145 21-12.