What was found
AN EXISTING BLEND-OUT WAS IDENTIFIED AT FR78 + 290 MM, BETWEEN STRINGERS 27R-28R. THE BLEND-OUT WAS PERFORMED IN ACCORDANCE WITH SRM PART II 51-10-03, TYPE D. AFTER EVALUATION, IT WAS DETERMINED THAT THE BLEND-OUT EXCEEDS THE LIMITS SPECIFIED IN SRM PART II 53-23-01/AD51. THIS CONDITION REPORTED WAS REPAIRED IAW ETD2026-190-003049 DTD FEB 18 2026 AND DOCUMENTED UNDER COOPESA EO COO-EO-2026-23940-R00. JOB A1Q349 ITEM 21-23.